Skip to Content
Project Detail

L'Oréal, Great Britain

A detailed case study of our custom installation for L'Oréal, Great Britain. Providing safety and efficiency through advanced engineering.

L'Oréal, Great Britain

Project Overview

L'Oréal operates a foam extinguishing process in its warehouses world-wide which it developed itself. In order to minimize the risks for staff during a fully-automatic closure of the warehouse entrances, the BLOBEL facility switches to a pressure-reduced safety circuit when it is activated and closes with a reduced pressure of 43.5–72.5 psi (3–5 bar).
Project Details
Project Type
Containment Systems
Status
Completed
Location
Global Installation